PENENTUAN INTERVAL WAKTU MAINTENANCE FORKLIFT TERHADAP KOMPONEN KRITIS BERDASARKAN DATA KERUSAKAN MESIN MENGGUNAKAN METODE PREVENTIVE AGE REPLACEMENT (Studi kasus: PT. XXX)

dc.contributor.authorgustama p. alhadi, din aswan amran ritonga, junaidi
dc.date.accessioned2023-10-11
dc.date.available2023-10-11
dc.date.issued2021
dc.identifier.uri https://sinta.kemdikbud.go.id/journals/profile/10007?q=Penentuan+Interval+Waktu+Maintenance+Forklift+Terhadap+Komponen+Kritis+Berdasarkan+Data+Kerusakan+Mesin+Menggunakan+Metode+Preventive+Age+Replacement+
dc.description.abstract A forklift is a lifting tool that functions to move goods from one place to another, with a short distance and a certain height, this heavy equipment is very useful because it can move very heavy goods in a vertical or horizontal direction. Problems that are often especially related to damage to unit components at PT. XXX, which are composed of the main part, namely the forklift engine. Damage to this section can result in downtime and delay in the production process which results in machine performance being less effective and efficient. Effectiveness in the production process requires the right strategy to keep the machine in operation by determining the optimal maintenance time interval using the criticality analysis method. After calculating with the criticality analysis method, it is found that the components of the hydraulic system and transmission are critical components. Furthermore, preventive replacement measures for hydraulic system components can be taken after 6800 hours of operation. The transmission component can also be done after operating for 900 hours or during an overhaul. While the inspection action for hydraulic system components is carried out after operating for 620.76 hours, the transmission component is carried out after operating for 540.39 hours. After checking and inspection, the avaibility value of the two components is above 95%, which means that the inspection can increase availability and prevent downtime in the unit and optimize the production process.en_US
dc.language.isoenen_US
dc.publisherUniversitas Harapan Medanen_US
dc.subjectinterval waktu maintenance forklift terhadap komponen kritis berdasarkan data kerusakan mesin menggunakan metode preventive age replacement en_US
dc.titlePENENTUAN INTERVAL WAKTU MAINTENANCE FORKLIFT TERHADAP KOMPONEN KRITIS BERDASARKAN DATA KERUSAKAN MESIN MENGGUNAKAN METODE PREVENTIVE AGE REPLACEMENT (Studi kasus: PT. XXX)en_US
dc.typeKarya Ilmiahen_US


File In This Item

No Thumbnail
Name 2e7c025bf720e3d8dccbade5530e3691jitekh_2021.pdf
Size 283445 Mb
Format application/pdf
Description fulltext
Fulltext

This item appears in the following Collection(s)

Karya Ilmiah [1281]

Show Simple Item Record