dc.contributor.author | gustama p. alhadi, din aswan amran ritonga, junaidi | |
dc.date.accessioned | 2023-10-11 | |
dc.date.available | 2023-10-11 | |
dc.date.issued | 2021 | |
dc.identifier.uri |
https://sinta.kemdikbud.go.id/journals/profile/10007?q=Penentuan+Interval+Waktu+Maintenance+Forklift+Terhadap+Komponen+Kritis+Berdasarkan+Data+Kerusakan+Mesin+Menggunakan+Metode+Preventive+Age+Replacement+
| |
dc.description.abstract |
A forklift is a lifting tool that functions to move goods from one place to another, with a short
distance and a certain height, this heavy equipment is very useful because it can move very heavy
goods in a vertical or horizontal direction. Problems that are often especially related to damage
to unit components at PT. XXX, which are composed of the main part, namely the forklift engine.
Damage to this section can result in downtime and delay in the production process which results
in machine performance being less effective and efficient. Effectiveness in the production
process requires the right strategy to keep the machine in operation by determining the optimal
maintenance time interval using the criticality analysis method. After calculating with the
criticality analysis method, it is found that the components of the hydraulic system and
transmission are critical components. Furthermore, preventive replacement measures for
hydraulic system components can be taken after 6800 hours of operation. The transmission
component can also be done after operating for 900 hours or during an overhaul. While the
inspection action for hydraulic system components is carried out after operating for 620.76
hours, the transmission component is carried out after operating for 540.39 hours. After checking
and inspection, the avaibility value of the two components is above 95%, which means that the
inspection can increase availability and prevent downtime in the unit and optimize the production
process. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Universitas Harapan Medan | en_US |
dc.subject | interval waktu maintenance forklift terhadap komponen kritis berdasarkan data kerusakan mesin menggunakan metode preventive age replacement | en_US |
dc.title | PENENTUAN INTERVAL WAKTU MAINTENANCE FORKLIFT TERHADAP KOMPONEN KRITIS BERDASARKAN DATA KERUSAKAN MESIN MENGGUNAKAN METODE PREVENTIVE AGE REPLACEMENT (Studi kasus: PT. XXX) | en_US |
dc.type | Karya Ilmiah | en_US |