ANALISIS PERBANDINGAN VOLUME DAN BIAYA BAR BENDING SCHEDULE (BBS) DENGAN METODE SNI 2847:2013 DAN BS 8666:2005 PADA RUANG KELAS BARU (RKB) PROYEK PEMBANGUNAN SMA PLUS LANGKAT (STUDI KASUS)

dc.contributor.authorPurba, Manganju
dc.date.accessioned2023-02-22
dc.date.available2023-02-22
dc.date.issued2022
dc.identifier.uri https://repositori.unhar.ac.id/handle/441/analisis-perbandingan-volume-dan-biaya-bar-bending-schedule-bbs-dengan-metode-sni-28472013-dan-bs-86662005-pada-ruang-kelas-baru-rkb-proyek-pembangunan-sma-plus-langkat-studi-kasus
dc.description.abstract The Senior High School Plus of Langkat development project is a project consisting of 9 types of buildings, namely office buildings, New Classrooms, teacher rooms and IT rooms, library rooms and computer rooms, gates and guard posts, waiting and receiving rooms, Health Unit building School, canteen and public toilets. This project has a total building area of 2,208,430 m2. Due to the different types of buildings, both in terms of function and size, the structure of each building is also different. The difference in structure is what makes the concrete work and reinforcement of each building different. The thing that most influences the difference in the reinforcement work of the structures of these buildings is the difference in the size of the reinforcing steel used, the bending and cutting of the reinforcing steel. These three things are parameters of success in reinforcement work in order to avoid or reduce waste material. Therefore, it is necessary to calculate the reinforcement by making a Bar Bending Schedule (BBS). The method used in calculating the Bar Bending Schedule (BBS) is using the SNI 2847:2013 and BS 8666:2005 methods. From the results of the comparative analysis of the volume and cost of the two Bar Bending Schedule (BBS) methods, it is found that the cost optimization of 0.2301% (for the BS 8666:2005 method), means that the Bar Bending Schedule (BBS) calculation with the BS 8666:2005 method can reduce the cost of reinforcing steel is 0.2301% or Rp 374.601,02 compared to using the SNI 2847:2013 method. Keywords: Bar Bending Schedule (BBS), BS 8666:2005, SNI 2847:2013. en_US
dc.language.isoenen_US
dc.publisherUniversitas Harapan Medanen_US
dc.subjectPERBANDINGAN VOLUME DAN BIAYA BAR BENDING SCHEDULE (BBS) en_US
dc.titleANALISIS PERBANDINGAN VOLUME DAN BIAYA BAR BENDING SCHEDULE (BBS) DENGAN METODE SNI 2847:2013 DAN BS 8666:2005 PADA RUANG KELAS BARU (RKB) PROYEK PEMBANGUNAN SMA PLUS LANGKAT (STUDI KASUS)en_US
dc.typeSkripsien_US


File In This Item

No Thumbnail
Name 6c13f24905ba311011afa4aea6ac5c28Skripsi_Manganju Purba_202313003.docx
Size 1567460 Mb
Format application/vnd.openxmlformats-officedocument.wordprocessingml.document
Description peer_review
Peer Review

This item appears in the following Collection(s)

Skripsi [1281]

Show Simple Item Record