STUDI KINERJA WAKTU DAN BIAYA PROYEK DENGAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN RUAS JALAN SP. ARMED-RUMAH GERAT KEC. BIRU-BIRU KAB. DELI SERDANG (Studi Kasus)
dc.contributor.author | Giawa, Ridho Jasman | |
dc.date.accessioned | 2025-08-25 | |
dc.date.available | 2025-08-25 | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://repositori.unhar.ac.id/handle/1642/studi-kinerja-waktu-dan-biaya-proyek-dengan-metode-earned-value-pada-proyek-pembangunan-ruas-jalan-sp-armed-rumah-gerat-kec-biru-biru-kab-deli-serdang-studi-kasus | |
dc.description.abstract | Project delays are caused by a lack of good control, thus affecting the time and cost of completion, in determining and knowing the time performance and cost performance on the SP Road Section Development Project. Armed-Rumah Great Kec. Blue-Blue Kab. Deli Serdang. By using the Earned Value method. Based on the results carried out, the results of the time performance from week 1 to week 15 are faster than the planned schedule, this is shown from the schedule variant (SV) indicator which has a positive value of Rp. 96,183,089.00 or schedule performance index (SPI) = 1.024. After analyzing the time, the final completion of the project was 22.038 weeks, experiencing a delay of -0.038 weeks or -0.173% compared to the planned time duration of 22 weeks, so the project was not completed on time. As for the cost performance from week 1 to week 15, costs were smaller than planned, this is shown by the positive cost variance (CV) indicator of Rp. 501,149,660.35 or cost performance index (CPI) = 1.136 > 1. Keywords: Performance, Time, Cost. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Universitas Harapan Medan | en_US |
dc.subject | METODE EARNED VALUE | en_US |
dc.title | STUDI KINERJA WAKTU DAN BIAYA PROYEK DENGAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN RUAS JALAN SP. ARMED-RUMAH GERAT KEC. BIRU-BIRU KAB. DELI SERDANG (Studi Kasus) | en_US |
dc.type | Skripsi | en_US |