ANALISIS PERCEPATAN WAKTU DENGAN METODE FAST-TRACK PADA PELAKSANAAN PEMBANGUNAN IRIAN SUPERMARKET SETIABUDI OLEH PT. MITRA MANDIRI ASETINDO (Studi Kasus)

dc.contributor.authorSidabutar, Kriston Darwin
dc.date.accessioned2025-05-06
dc.date.available2025-05-06
dc.date.issued2024
dc.identifier.uri https://jurnal.uisu.ac.id/index.php/but/article/view/10027
dc.description.abstract Construction activity management always involves planning, determining construction schedules and controlling. The implementation of a construction project will often have unplanned problems, so that the delay will make the project implementation time that has been planned in the initial contract will change. Often when the implementation of the project in the field is not in accordance with the initial planning, so that many deviations occur including project delays. The risk of project delays can be minimized by using various methods of accelerating project implementation time, one of which is the Fast Track method. Fast Track is a scheduling method whose project completion time is faster than the planned time by using more efficient ways so as to reduce project implementation time. The purpose of this study is to determine the time savings and what work has become shorter after applying scheduling with the Fast Track method on the Irian Supermarket Setiabudi Medan construction project. From the research results, it was found that the initial implementation time was 455 days and after acceleration with the Fast Track method the results were 431 days, so using the Fast Track method there was an acceleration of time for 24 days from the initial implementation time or an acceleration of 5.27% from the initial planning. Of all the work items, there are several work items that are accelerated, including: bottom structure work accelerated by 4 days, ground floor work accelerated by 10 days, masonry work accelerated by 10 days, ceramic floor work accelerated by 10 days. Keywords: Fast Track Method, Time Acceleration, Project management. en_US
dc.language.isoenen_US
dc.publisherUniversitas Harapan Medanen_US
dc.subjectMETODE FAST TRACK en_US
dc.titleANALISIS PERCEPATAN WAKTU DENGAN METODE FAST-TRACK PADA PELAKSANAAN PEMBANGUNAN IRIAN SUPERMARKET SETIABUDI OLEH PT. MITRA MANDIRI ASETINDO (Studi Kasus)en_US
dc.typeSkripsien_US


File In This Item

No Thumbnail
Name ed05188d2dcc42ec899ae5707ec00d8fKRISTON DARWIN SIDABUTAR.docx
Size 4078217 Mb
Format application/vnd.openxmlformats-officedocument.wordprocessingml.document
Description peer_review
Peer Review

This item appears in the following Collection(s)

Skripsi [1430]

Show Simple Item Record