EVALUASI KINERJA TURBIN & GENERATOR PEMBANGKIT LISTRIK TENAGA AIR DI PT INALUM POWER PLANT MENGGUNAKAN GADS, DISTRIBUSI EKSPONENSIAL DAN ANALISIS FMEA

dc.contributor.authorPratiwi, Dianty
dc.date.accessioned2025-02-04
dc.date.available2025-02-04
dc.date.issued2022
dc.identifier.uri https://repositori.unhar.ac.id/handle/1367/evaluasi-kinerja-turbin-generator-pembangkit-listrik-tenaga-air-di-pt-inalum-power-plant-menggunakan-gads-distribusi-eksponensial-dan-analisis-fmea
dc.description.abstract PT INALUM Power Plant is a company that builds and operates a hydropower plant consisting of Siguragura (SGP) and Tangga (TNP) power stations. So that requires PT INALUM Power Plant to continue to optimize its maintenance policy. Even though maintenance activities have been carried out, the frequency of damage to each unit still occurs frequently, resulting in a unit trip (termination) namely a forced outage, which affects the amount of downtime. To overcome this problem, in this study the method used to determine the performance of the power plant is using the Generating Availability Data System (GADS), then the method used to determine the reliability and rate of damage is using an exponential distribution. Meanwhile, to evaluate the cause of damage to the turbine & generator using FMEA analysis. The conclusion in this study is that the highest downtime value in the Siguragura hydropower plant occurs in the T/Ge1 unit of 2.46% and in the Tangga hydropower plant it occurs in the T/Ge3 unit of 2.80%. Appropriate evaluation measures on the performance of hydroelectric power plants are performing maintenance with the type of periodical maintenance and preventive maintenance. Especially T/Ge1 PLTA Siguragura on the air cooler & metal cooling tube component and T/Ge3 PLTA Tangga on the MTR Bushing component. The right maintenance strategy to minimize forced outage is to review the company's planned maintenance on the air cooler & metal cooling tube for routine flushing for 35,287 hours (per ±1 day) or 70.574 hours (±3 days). In MTR Bushing, routine repairs are carried out for 51.306 hours (per ±2 days) or 102.612 hours (±4 days). Keywords: Turbine & Generator, GADS, Exponential, FMEA en_US
dc.language.isoenen_US
dc.publisherUniversitas Harapan Medanen_US
dc.subjectEVALUASI KINERJA TURBIN & GENERATOR en_US
dc.titleEVALUASI KINERJA TURBIN & GENERATOR PEMBANGKIT LISTRIK TENAGA AIR DI PT INALUM POWER PLANT MENGGUNAKAN GADS, DISTRIBUSI EKSPONENSIAL DAN ANALISIS FMEAen_US
dc.typeSkripsien_US


File In This Item

No Thumbnail
Name 2dd3e391b42ec5e93bac63b3e08a6afbDIANTY PRATIWI_212368035.docx
Size 3503084 Mb
Format application/vnd.openxmlformats-officedocument.wordprocessingml.document
Description peer_review
Peer Review

This item appears in the following Collection(s)

Skripsi [1347]

Show Simple Item Record