EVALUASI RENCANA ANGGARAN BIAYA (RAB) DAN PROSES TENDER PROYEK REHABILITAS GEDUNG SEKOLAH POLISI NEGARA POLDA SUMUT

dc.contributor.authorDahlan, Bayu Setiawan
dc.date.accessioned2024-07-10
dc.date.available2024-07-10
dc.date.issued2023
dc.identifier.uri https://jurnal.uisu.ac.id/index.php/but/article/view/7928
dc.description.abstract The state police school is a place of education for prospective National Police non-commissioned officers in terms of learning materials, physical, mental and skills in fulfilling their duties and responsibilities as members of the National Police. In this case, facilities and infrastructure greatly influence students in terms of learning and comfort in their environment. Therefore, rehabilitation is carried out on the building so that it remains good and comfortable in carrying out learning activities. The aim of this thesis is to find out how much the Planned Budget (RAB) is and what the Tender process for the North Sumatra Police State Police School Rehabilitation Project is. The method used in calculating the RAB is the Burgerlije Openbare Warken (BOW) analysis and Cipta Karya analysis. Meanwhile, the tender process uses an electronic method (LPSE). The results of the Cost Budget Plan show that for Preliminary Work costs Rp. 169,092,120.-, Ceiling Work Rp. 600,407,998.-, Floor Work Rp. 443,813,805.-, Bathroom Work Rp. 50,381,850.- Painting Work Rp. 164,985,170.-, Work Electricity Rp.233,680,550.-, Door and Window Work Rp.13,999,000,-. The total result was IDR 1,677,000,000.-. Meanwhile, the tender process is carried out using LPSE electronic media, and the auction stages are an illustration of the sequence in the auction from Post-qualification to Contract Signing. Keywords: Project implementation, coast budged Plan, Tender. en_US
dc.language.isoenen_US
dc.publisherUniversitas Harapan Medanen_US
dc.subjectRENCANA ANGGARAN BIAYA en_US
dc.titleEVALUASI RENCANA ANGGARAN BIAYA (RAB) DAN PROSES TENDER PROYEK REHABILITAS GEDUNG SEKOLAH POLISI NEGARA POLDA SUMUTen_US
dc.typeSkripsien_US


File In This Item

No Thumbnail
Name 5ffa75b594ad70af7b789400b236055eBayu Setiawan Dahlan.docx
Size 1560601 Mb
Format application/vnd.openxmlformats-officedocument.wordprocessingml.document
Description peer_review
Peer Review

This item appears in the following Collection(s)

Skripsi [1121]

Show Simple Item Record